01 / AVOIDED COST
Lower energy costs.
Use solar on site. Dispatch storage around energy prices and peak demand.
SOLAR + STORAGE + ON-SITE AI COMPUTE
Solar and battery storage to reduce energy costs, paired with NVIDIA-powered servers that can generate income from paid AI workloads.
For landlords and businesses that own their premises. Symmetric Energy designs the energy systems around your building and planned compute load, and coordinates deployment and support.
Start a property reviewDownload the property overview (PDF) ↗
NVIDIA GPU systems in stock. Installation following site approval.
Site fit first. Installed budget and financial modeling for suitable properties.

SITE FIT FIRST
We assess existing resources and required upgrades before defining the investment.
THE CONNECTED PROPERTY
Design the energy supply and the productive uses together.
Utility gridSolarBattery storageBuilding loadsEV charging · optionalAI computeSolar, storage and grid supply serve the building and planned compute load through one site electrical system. EV charging is optional.
01 / AVOIDED COST
Use solar on site. Dispatch storage around energy prices and peak demand.
02 / REVENUE OPPORTUNITY
AI customers→Cloud platform→Owner proceeds
After contractual deductions and site costs. EV charging can add fees where offered.
OWNER-OCCUPIED PROPERTIES
Reduce energy costs for your business and evaluate additional proceeds from equipment you own.
TENANT-OCCUPIED PROPERTIES
Offer discounted on-site solar power where permitted, alongside potential compute income.
Tenant arrangements depend on lease terms, metering and utility requirements.
Additional potential value: export bill credits and enrolled grid-program payments, where eligible.
Illustrative configuration, not an electrical design. Value depends on tariffs, permissions, enrollment and costs; the same energy or capacity is not counted twice.
THE OWNER’S INVESTMENT SNAPSHOT
Choose an eight-GPU configuration built around NVIDIA RTX PRO 6000 Blackwell or NVIDIA B300 GPUs. Your proposal prices the complete installed scope.
NVIDIA RTX PRO 6000 Blackwell · 8 GPUs
~$309k
Compute package only. Energy systems and site works additional.
95% ASSUMED BILLED USE
BEFORE FINANCING AND TAX
~$73k / year
Illustrative annual operating cash
90–100% assumed use: $67k–$78k/year
23.5% package cash yield at 95% use
NVIDIA B300 · 8 GPUs
~$839k
Compute package only. Energy systems and site works additional.
95% ASSUMED BILLED USE
BEFORE FINANCING AND TAX
~$308k / year
Illustrative annual operating cash
90–100% assumed use: $289k–$327k/year
36.8% package cash yield at 95% use
Package cash yield = annual operating cash divided by compute-package price. It is not IRR or whole-project ROI. Additional energy/site capital reduces yield; losses are possible. High billed utilization is an assumption, not verified contracted demand.
Shipping, tax, electrical work, cooling, connectivity and any new solar, storage or optional EV charging are additional. Energy savings and other income streams are evaluated separately, with electricity and tax benefits counted once.
Both cases use 730 hours/month, assumed 90–100% billed use, an assumed 10% cloud deduction allowance before an 80% host share, and effective energy cost of $0.25/kWh. RTX uses the documented $16.64/server-hour reference, 9.4 kW continuous site load, $300/month fiber and $250/month reserve. B300 uses $60/server-hour, 18.8 kW, $330/month fiber and $500/month reserve.
The deduction allowance, reserves and energy rate are unverified modeling inputs. Actual fees and site expenses may be higher. There is no assumed storage/add-on income, future rate increase, tax saving or resale value. Results exclude financing, income tax, major repairs, replacement and added energy/site capital. This is sensitivity analysis, not a validated forecast or a conservative earnings floor. The calculator allows different realized rates, including higher rates, without representing them as contracted pricing.
Stress cases at the same inputs: RTX at 50% / 70% billed use produces about $25k / $46k annual operating cash; B300 about $138k / $214k. Idle-site costs can produce losses. Additional installed capital and financing change cash recovery materially.
FIVE-YEAR RTX HIGH-USE ILLUSTRATION
The 90%, 95% and 100% billed-use RTX cases, held flat over five years. The dashed line is the reference compute package; new energy and site capital raise the capital recovery threshold.
At these assumed operating levels, arithmetic RTX package payback is about 4.0–4.6 years; B300 about 2.6–2.9 years. These are package-only calculations, not whole-project forecasts. They assume flat cash and ignore equipment life, financing, tax, major repairs and replacement. Actual capital recovery may take longer or never occur.
EXPLORE THE SENSITIVITY
Change the operating inputs. Enter the complete installed budget to see arithmetic cash yield and simple payback. A quote and project model are still required.
Cash yield and payback use operating cash before financing and tax. Simple payback holds annual cash constant and ignores equipment life, discounting, major repairs and replacement. A payback longer than economic life may never be achieved. An entered debt payment changes annual cash but does not establish equity ROI. This calculator tracks compute operating cash; it does not model building energy savings, tax effects or overall project IRR.

MODULAR COMPUTE. PLANNED ENERGY CAPACITY.
Begin with one 8-GPU server in a suitable cabinet. Add servers within engineered rack limits, then additional cabinets as paid demand, operating results and site capacity support the investment.
Plan for access as well as equipment.The cabinet alone occupies about 10.3 sq ft. Allow 36 inches at the front and rear for service. The 26 sq ft figure covers the rack and those zones. Cooling, UPS, electrical equipment, delivery access and floor loading can require additional room and engineering.
BUILD THE OWNERSHIP CASE
Eligible energy tax credits and 100% federal bonus depreciation on qualifying assets can strengthen ownership. Evaluate them alongside operating cash flow and your complete capital budget.
Tax benefits depend on asset eligibility, ownership, timing, sourcing and adjusted basis. California does not conform to federal bonus depreciation. Confirm the project with your tax adviser. Solar timing · Federal depreciation · California treatment.
A CLEAR DIVISION OF RESPONSIBILITY
Maintenance, monitoring and service responsibilities are defined in your project agreement.
Start a property review with Elliott ↗Start with the cabinet footprint: at least 31.5 × 47.2 inches, plus 36-inch front and rear service clearances—roughly 26 sq ft for the rack and those service zones. The room may need additional area for cooling, UPS, electrical equipment and access.
A suitable site needs adequate electrical capacity, dedicated fiber, secure space and engineered cooling. The review identifies usable resources, required upgrades and the scope for further engineering.
Yes. This is an equipment ownership opportunity. Compute hardware, electrical work, cooling, connectivity and any solar or storage development form part of the investment. Financing is subject to approval and final terms.
Suitable projects move to a property-specific model covering paid utilization, workload pricing, contractual deductions and electricity, connectivity, maintenance and financing costs. Lower-demand cases are part of the assessment. Revenue and returns are not guaranteed; financing can make cash flow negative.
Size solar and storage around the combined building and compute loads. Additional capacity is part of the plan where its costs and operating value support the investment. These are grid-connected projects; renewable share, grid imports and backup arrangements depend on the energy design and operating requirements.
LET’S START WITH YOUR PROPERTY
Send a property address. We’ll assess power, fiber, space and the scope for further engineering. Suitable properties move to detailed technical and financial modeling.
01 Identify the resources already on site.
02 Understand the upgrades a project would need.
03 Define the scope for engineering and financial modeling.
Elliott Jessup · Symmetric Energy
elliott@symmetricenergy.com
California now.
Texas and Illinois planned for 2027.